Besix

Location

Founded

1973-12-03

Risk Signals

1081 news mentions monitored

Industry Context

This company is tracked across risk categories, including those related to its sector (e.g., General Contractors—Residential Buildings, Other Than Single-Family), including supply chain integrity, ESG practices, labor disputes, and regulatory compliance.

Recent Articles about Besix

Live alerts from global media, monitored by Business Radar

BESIX-Indaver consortium starts construction of wastewater-to-energy facility

2024-11-02 (endswasteandbioenergy.com)

BESIX-Indaver consortium starts construction of wastewater-to-energy facility

Read BESIX-Indaver consortium starts construction of wastewater-to-energy facility and other waste-to-energy news & info on ENDS Waste & Bioenergy

Read more
Hitachi Zosen Inova to build the World’s largest Energy from Waste Plant in Dubai

2024-10-06 (bulk-online.com)

Hitachi Zosen Inova to build the World’s largest Energy from Waste Plant in Dubai

Dubai Municipality has selected Swiss clean tech company Hitachi Zosen Inova in a joint venture with Belgium’s largest construction company BESIX Group to build the world’s largest energy-from-wa

Read more
Besix's Dubai W-t-E plant enters full commercial operations

2024-09-25 (gulfconstructiononline.com)

Besix's Dubai W-t-E plant enters full commercial operations

<div> Belgian infrastructure major Besix has announced that the Warsan Waste-to-Energy plant, which was developed in partnership with Hitac

Read more
Besix is ​​building a mega waste-to-energy plant in Dubai

2024-08-22 (tijd.be)

Besix is ​​building a mega waste-to-energy plant in Dubai

The Belgian construction group Besix will play a key role in Dubai in the construction, operation and maintenance of one of the largest waste-to-energy plants in the world. This shows how important it is today to be more than just a classic construction company.

Read more
Besix is ​​building a mega waste-to-energy plant in Dubai

2024-08-22 (tijd.be)

Besix is ​​building a mega waste-to-energy plant in Dubai

The Belgian construction group Besix will play a key role in Dubai in the construction, operation and maintenance of one of the largest waste-to-energy plants in the world. This shows how important it is today to be more than just a classic construction company.

Read more
Control shows that the asphalt plant in Roermond emitted more hazardous substances than permitted

2024-01-26 (limburger.nl)

Control shows that the asphalt plant in Roermond emitted more hazardous substances than permitted

An inspection carried out last May by a specialist company showed that the Besix asphalt plant in Roermond exceeded the standard for the emission of paks (hazardous substances).

Read more
Control shows that the asphalt plant in Roermond emitted more hazardous substances than permitted

2024-01-26 (limburger.nl)

Control shows that the asphalt plant in Roermond emitted more hazardous substances than permitted

An inspection carried out last May by a specialist company showed that the Besix asphalt plant in Roermond exceeded the standard for the emission of paks (hazardous substances).

Read more
Besix, Hitachi mark launch of operations at $1.2bln Dubai WtE plant

2023-07-06 (zawya.com)

Besix, Hitachi mark launch of operations at $1.2bln Dubai WtE plant

Chosen for its extensive experience and expertise in complex infrastructure projects, Besix will play an integral role in the DWE project

Read more
BESIX and Hitachi Zosen Inova celebrate the successful first fire at Dubai Waste to Energy facility

2023-07-05 (zawya.com)

BESIX and Hitachi Zosen Inova celebrate the successful first fire at Dubai Waste to Energy facility

With visit from Crown Prince of Dubai

Read more
BESIX and Hitachi Zosen Inova celebrate the successful first fire at Dubai Waste to Energy facility

2023-07-05 (zawya.com)

BESIX and Hitachi Zosen Inova celebrate the successful first fire at Dubai Waste to Energy facility

With visit from Crown Prince of Dubai

Read more
BESIX and Hitachi Zosen Inova celebrate the successful first fire at Dubai Waste to Energy facility

2023-07-05 (zawya.com)

BESIX and Hitachi Zosen Inova celebrate the successful first fire at Dubai Waste to Energy facility

With visit from Crown Prince of Dubai

Read more
Made from 40% recycled material: first circular homes ceremonially opened in Diest

2023-06-02 (made-in.be)

Made from 40% recycled material: first circular homes ceremonially opened in Diest

The first two circular homes of the Circle company have been built on Pegasusstraat in Diest. Forty percent of the materials are recycled.

Read more

Never miss a headline about Besix

Set up smart alerts with Business Radar and receive real-time updates on any new risk signal or major news story.

  • ✔️ Used by 100+ compliance teams and analysts
  • ✔️ Covers 154M+ sources in 40+ languages