Alliander N.V.

Location

Gelderland

Founded

1998-12-17

Risk Signals

2347 news mentions monitored

Industry Context

This company is tracked across risk categories, including those related to its sector (e.g., Offices of Holding Companies, Not Elsewhere Classified), including supply chain integrity, ESG practices, labor disputes, and regulatory compliance.

Recent Articles about Alliander N.V.

Live alerts from global media, monitored by Business Radar

Electricity Huisje at the View Location leads to Huissens Citizens' Initiative | RTV Connect

2025-06-30 (rtvconnect.nl)

Electricity Huisje at the View Location leads to Huissens Citizens' Initiative | RTV Connect

Power and gas are moved via networks of cables and pipes. The Liander company takes care of the construction and maintenance in the municipality of Lingewaard. Liander is responsible for the electricity houses, which are preferably tucked away between bushes or parking ports. In Huissen, such a house is disfigured that is more a block than it looks like a house, for some time showing the historic center. At least, that is the complaint and now one of the views of the Huissense citizens' initiative group 'Tension with sight'.

Read more
Network operators use households against Netcongestie -

2025-06-30 (stadszaken.nl)

Network operators use households against Netcongestie -

Network operators and energy suppliers will ask households to help in the fight against Netcongestie and to shift their power consumption.

Read more
35,000 households receive discounts in fight against overcrowded power grid | Economy |

2025-06-30 (bd.nl)

35,000 households receive discounts in fight against overcrowded power grid | Economy |

The three large network operators and the three large energy companies want to tempt 35,000 households in 21 neighborhoods with discounts to purchase home batteries and to charge cars at fewer busy hours. These are neighborhoods where the power grid is on the edge of the capacity, the discounts are 500 euros or more. For example, malfunctions must be prevented.

Read more
How do we get rid of the overcrowded power grid? 'Building, building, building' - Studio Kaag and Braassem

2025-06-29 (studiokaagenbraassem.nl)

How do we get rid of the overcrowded power grid? 'Building, building, building' - Studio Kaag and Braassem

REGION -The power grid must be built as quickly as possible to get out of trouble in South Holland. That is what the network operators say in a hearing of the province about the crowded ...

Read more
- Real -time interface solar panels: less fast than expected, but network operators have first successes

2025-06-26 (solarmagazine.nl)

- Real -time interface solar panels: less fast than expected, but network operators have first successes

The real-time interface for controlling wind and solar energy makes steps forward, although the rollout is less fast than previously expected. The network operators jointly have 9 projects operational.

Read more
Top Bouwend Nederland, Netbeheer Nederland and Alliander: "Ensure that builders can build!" |

2025-06-25 (telegraaf.nl)

Top Bouwend Nederland, Netbeheer Nederland and Alliander: "Ensure that builders can build!" |

The expansion of the high -voltage network in Gelderland, Utrecht and Flevoland Stokt. The construction of tens of thousands of homes is in danger of coming to a halt. Economic development is hindered. Outgoing or not, politics must take measures to designate construction sites for the construction of energy infrastructure, as well as for the necessary nitrogen space, find Arno Visser (Bouwend Nederland) and Maarten Otto (Netbeheer Nederland and Alliander).

Read more
- Drastic measures network operators to prevent the Noord-Holland power grid failure

2025-06-25 (solarmagazine.nl)

- Drastic measures network operators to prevent the Noord-Holland power grid failure

Network operators Tennet and Liander present radical measures to prevent overloading and failure of the Noord-Holland power grid. The first overload is expected in the winter of 2026-2027.

Read more
Alliander awards €422m tender to expand medium-voltage stations | Smart Energy International

2025-06-24 (smart-energy.com)

Alliander awards €422m tender to expand medium-voltage stations | Smart Energy International

Alliander has awarded a tender of €422 million to renew and expand the capacity of its electricity stations on the medium-voltage network.

Read more
New platform for future -proof housing and energy issues -

2025-06-19 (emerce.nl)

New platform for future -proof housing and energy issues -

The Netherlands stands for two major challenges: building 1 million new homes before 2030 at a time when it […]

Read more
RTV Purmerend.nl - Safety checks on the Middenweg Noordbeemster

2025-06-17 (rtvpurmerend.nl)

RTV Purmerend.nl - Safety checks on the Middenweg Noordbeemster

Safety controls on the Middenweg Noordbeemster

Read more
- Expansion of the Utrecht, Gelderland and Flevoland River Cutries delayed for years

2025-06-12 (solarmagazine.nl)

- Expansion of the Utrecht, Gelderland and Flevoland River Cutries delayed for years

Large -scale expansion projects of the high -voltage network in Utrecht, Gelderland and the Flevopolder are delayed for years. The delivery is shifting from 2029 to 2033, possibly even 2035.

Read more
Do you have an additional 4 years? -: Knowledge Center and representative

2025-06-12 (vemw.nl)

Do you have an additional 4 years? -: Knowledge Center and representative

Today, national network operator Tennet reports that Net extends in the FGU regions (Flevoland, Gelderland, Utrecht) are again considerably delayed.

Read more

Never miss a headline about Alliander N.V.

Set up smart alerts with Business Radar and receive real-time updates on any new risk signal or major news story.

  • ✔️ Used by 100+ compliance teams and analysts
  • ✔️ Covers 154M+ sources in 40+ languages