Peter Kiewit Sons', Inc.
Location
Nebraska
Founded
1997-02-28
Website
Risk Signals
701 news mentions monitored
Industry Context
This company is tracked across risk categories, including those related to its sector (e.g., General Contractors—Nonresidential Buildings, Other than Industrial Buildings and Warehouses, Highway and Street Construction, Except Elevated Highways, Bridge, Tunnel, and Elevated Highway Construction, Heavy Construction, Not Elsewhere Classified, Plumbing, Heating and Air-Conditioning), including supply chain integrity, ESG practices, labor disputes, and regulatory compliance.
Filter risk signals by topic
Select a theme below to explore the company’s news mentions in specific risk areas.
Recent Articles about Peter Kiewit Sons', Inc.
Live alerts from global media, monitored by Business Radar
2025-01-14 (reminetwork.com)
Lafarge lands YVR runway paving contract - REMI Network
Lafarge Canada has been selected as the subcontractor for the paving of the Vancouver North Runway Modernization Program.
Read more2025-01-08 (thebaltimorebanner.com)
Key Bridge: State selects engineering consultant to oversee rebuild -
A group of firms were awarded a $75 million contract to manage the Key Bridge builder “by auditing their processes, reviewing submittals and confirming the design criteria is met.”
Read more2024-12-25 (wnyt.com)
Preconstruction work to begin in January to rebuild collapsed Baltimore bridge - .com NewsChannel 13
Preconstruction work to collect data to design a new Francis Scott Key Bridge in Baltimore is scheduled to begin in January. The Baltimore Sun, citing Maryland Transportation Authority spokesperson Bradley Tanner, reports that work is scheduled to include topographic and underwater surveys, as well as soil sampling. The rebuilding effort is expected to take nearly four years and cost about $2 billion. In August, the Maryland Transportation Authority awarded the construction contract to the Omaha, Nebraska-based Kiewit Corporation. The bridge collapsed March 26 after a container ship lost power and crashed into one of its columns, sending six members of a roadwork crew plunging to their deaths.
Read more2024-12-24 (kstp.com)
Preconstruction work to begin in January to rebuild collapsed Baltimore bridge - .com 5 Eyewitness News
Preconstruction work to collect data to design a new Francis Scott Key Bridge in Baltimore is scheduled to begin in January. The Baltimore Sun, citing Maryland Transportation Authority spokesperson Bradley Tanner, reports that work is scheduled to include topographic and underwater surveys, as well as soil sampling. The rebuilding effort is expected to take nearly four years and cost about $2 billion. In August, the Maryland Transportation Authority awarded the construction contract to the Omaha, Nebraska-based Kiewit Corporation. The bridge collapsed March 26 after a container ship lost power and crashed into one of its columns, sending six members of a roadwork crew plunging to their deaths.
Read more2024-11-12 (enr.com)
Teamwork, Safety Keeps Phoenix Transit Line Project on Track
While clocking in at 1.6 miles in length, Valley Metro’s newest section of its Phoenix light rail system packs in many firsts for the area within its tight footprint.
Read more2024-11-07 (enerdata.net)
Kiewit secures LSTK contract for Glenfarne’s LNG facility (US)
Texas LNG Brownsville, a subsidiary of Glenfarne Energy Transition, has selected the US services provider Kiewit to lead the engineering, procurement, and construction (EPC) of its proposed 4 Mt/year LNG terminal in Port of Brownsville, Texas (US). Kiewit’ s subsidiaries, Kiewit Engineering Group
Read more2024-11-06 (constructiondive.com)
Ground stabilization job awarded for $16B Gateway project
Construction industry news, trends and jobs for building professionals who want mobile-friendly content.
Read more2024-10-31 (enr.com)
Project of the Year: Teamwork, Safety Keeps Phoenix Transit Line on Track
While clocking in at 1.6 miles in length, Valley Metro’s newest section of its Phoenix light rail system packs in many firsts for the area within its tight footprint.
Read more2024-10-30 (enr.com)
Zeal for Teamwork, Safety Keeps Phoenix Transit Line on Track
While clocking in at 1.6 miles in length, Valley Metro’s newest section of its Phoenix light rail system packs in many firsts for the area within its tight footprint.
Read more2024-10-29 (enr.com)
Southwest Project of the Year — Northwest Phase II Extension. Light Rail
While clocking in at 1.6 miles in length, Valley Metro’s newest section of its Phoenix light rail system packs in many firsts for the area within its tight footprint.
Read more2024-10-16 (constructionequipmentguide.com)
Wrecked By Hurricane, Two Tenn. Bridges Being Rebuilt : CEG
Two Tennessee bridges, destroyed by Hurricane Helene, are being rebuilt through a progressive design-build approach with the goal of completion by June 2025.
Read more2024-10-03 (ciarglobal.com)
Venture Global and Kiewit resolve dispute over confidential documents
The American supplier of liquefied natural gas Venture Global has reached an agreement with the construction company Kiewit to end the arbitration initiated in August by Venture denouncing the leak of confidential documents to Shell, within the framework of a series of arbitrations by the
Read more